Guangzhou Museum of Art cadmium telluride BIPV project
Installation Time:2022
Project Adress:Jiangsu Nantong
Capacity:3,073.6KW
Area of Installation:16,800㎡
Compared to traditional roof installations, cost reduction is 250 RMB per square meter, and annual electricity production is 2.966 million kWh
Annual Coal Savings: 1,008 metric tons
Annual CO₂ Emissions Reduced: 5,064.4 metric tons
Annual SO₂Emissions Reduced: 92.2 metric tons
Cesun Smart Solar Photovoltaic Component Manufacturing Base (Under Construction).
Scale
Installation Area
2.6MW
14,500m²
Utilizes a new BAPV construction solution, achieving perfect integration between photovoltaics and the rooftop.
First-year Electricity Generation: 2.577 million kWh
Annual Standard Coal Saved: 845 metric tons
Annual CO₂Emissions Reduced: 2,569 metric tons
Annual SO₂Emissions Reduced: 77.3 metric tons
ESS & EV Charging Station
Deploying an integrated PV-storage-charging hub, coupled with Cesun AI EMS platform syncing with parking and smart chargers, optimizes green energy use, stabilizing variable renewables, and cutting costs through peak management and grid support functions.
The adjacent commercial facilities provide drivers with catering services, snacks, fruits, car washes, and other complementary offerings, enhancing the revenue streams of the parking area.
Installation Time:2022
Project Adress:Zhejiang
Capacity:93.5KWp
Parking Spaces:30
Area:380㎡
Electricity Generation:≈9.02 million kWh㎡